Universal Scaffolding Extension Height 1 Railing Steel
Area covered 6m²
- Flexible
- Long service life
In stock Delivery within 3 working days | ART.NR E3019
Universal Scaffolding Extension Height 1 Railing Steel
The work area covered for the scaffold is one of the following:
* 3 meters in length and 2 meters in working height
Area of application: Universal Scaffolding Extension Height 1 Railing Steel is well suited for both lighter and heavier work that requires flexibility in height or width of the scaffolding, for example when painting, bricklaying or other facade work. It can also be mounted around the entire facade and adapted to doors and balconies.
Flexibility: Among other things, the standards make it possible to create a variety of different structures and thanks to the patented spring lock, the use of tools is completely eliminated during assembly and disassembly. The toe board is supplied in aluminium, the rest of the structure consists of extremely durable, hot-dip galvanised Swedish steel.