Barrier System secures landmark The Railyard project in Cork
HAKI Barrier System is helping deliver safe, efficient edge protection on The Railyard project in Cork, Ireland’s tallest residential building. Its modular, EN 13374-compliant design keeps the 25-storey project moving safely and efficiently.
As high-rise construction projects become increasingly ambitious, contractors require edge protection systems that deliver uncompromising safety without slowing progress. On The Railyard development in Cork, HAKI’s modular edge protection system is helping the project team maintain safe working environments while keeping pace with a fast-moving construction programme.
Project Overview
The Railyard is a landmark residential development on Albert Quay in Cork’s Docklands. Once complete, the 25-storey, 85.53m tower will become Ireland’s tallest residential building, providing 217 affordable apartments through Clúid Housing.
Delivered by JCD in partnership with Clúid Housing and Cork City Council, the project presents the challenges typical of modern high-rise construction including multiple working levels, evolving construction phases and a requirement for reliable collective fall protection.
Scope of Work
Maintaining safe working at height across a 25-storey structure demands an edge protection system that can be installed quickly, adapted as construction progresses and provide compliance throughout every stage of the build.
The project required a collective fall protection solution that complied with EN 13374 while supporting the demanding pace of a major high-rise construction programme. With completion scheduled for Q4 2027, the system needed to be quick to install to help maintain productivity and keep the project on schedule.
In addition, AB Access Scaffolding Ltd wanted the system to incorporate its branding, creating a visible presence across one of Cork's landmark developments.
Our Solution
HAKI supplied a complete EN13374-compliant edge protection barrier system designed to meet the project’s demanding safety and operational requirements.
The following products were selected to meet site needs:
- 1,042 x Mk2 90 2600 Barrier Panels in the customers RAL 5005 colour code
- 1,043 x 1350mm Posts
- 1,043 x VC Foot Attachment fixing into the top of the concrete slab
- 2,086 x VC Slider V2 (Hook Slider)
- 1,042 customised toe board stickers incorporating the AB Access Scaffolding Ltd branding
- Post stillages, barrier frames and euro boxes to support efficient logistics to the site
The modular design allows the edge protection to be installed, repositioned and extended quickly as each phase of construction progresses, ensuring protection is maintained without creating unnecessary delays.
To maximise visibility on this flagship project, the barrier panels were customised with AB Access Scaffolding Ltd branding, demonstrating how HAKI systems can be tailored to meet both operational and commercial objectives for our customers.
AB Access Scaffolding Ltd
AB Access Scaffolding Ltd is a leading Irish scaffolding and access specialist based in Cork, delivering safe, high-quality access solutions for commercial, residential and industrial projects. The company is recognised for its strong safety standards, technical expertise and ability to support complex construction projects.
Benefits of HAKI Barrier System
EN13374-Compliant Safety
The HAKI edge protection system provides collective fall protection in accordance with EN13374, helping the contractor maintain compliance while protecting operatives working at height throughout the build.
Designed for High-Rise Construction
Providing 1150mm high edge protection across every storey, the system delivers robust perimeter protection suited to the demands of multi-storey construction.
Adaptable Throughout the Build
As construction progresses floor by floor, the HAKI system can be quickly adjusted to suit changing site conditions, making it an ideal solution for phased high-rise developments.
Built Around the Customer
Customised barrier panels featuring AB Access Scaffolding Ltd branding demonstrate HAKI’s ability to provide solutions that not only improve safety but also enhance contractor visibility on prestigious projects.
Discover how the HAKI Barrier System
can benefit your next project.
Delivering Value Beyond Compliance
On a development as significant as The Railyard, edge protection needs to do more than satisfy regulations. It must support efficient construction, adapt to changing site conditions and provide confidence that operatives remain protected throughout the project.
By combining compliance, flexibility and ease of installation, HAKI’s edge protection system is helping the project team deliver one of Ireland’s most significant residential developments safely and efficiently.