Case Studies
HAKI has the market's most flexible and durable scaffolding system that suits all types of work. Here are some of the many solutions created with our range of innovative products.
Filter
Barrier System secures landmark The Railyard project in Cork
HAKI Barrier System is helping deliver safe, efficient edge protection on The Railyard project in Cork, Ireland’s tallest residential building. Its modular, EN 13374-compliant design keeps the 25-storey project moving safely and efficiently.
Temporary Roof at Cleeves Riverside Quarter in Limerick, Ireland
HAKITEC 750 Weather Protection safeguarded the restoration of Limerick's historic Cleeves Riverside Quarter, providing a fully enclosed temporary roof that enabled safe, uninterrupted heritage works despite challenging weather conditions.
Edge Protection & Fall Arrest systems: Mote Road project, Maidstone, Kent
This major town-centre residential regeneration project presented complex challenges, including working at height across multiple floors, a constrained urban site and phased construction sequencing. Robust, adaptable temporary Edge Protection, Fall Arrest and Access solutions were essential.
CLT Edge Protection for Timber Square project, London
Timber Square is a low-carbon development in Southwark, London, combining a transformed 1950s printworks with a new hybrid steel and cross laminated timber (CLT) office building. HAKI provided rental of temporary edge protection, Catchfan debris nets and bespoke CLT safety solutions, supported by on-site training.
Powder Gate (Prašná brána) restoration in Prague, Czech Republic
The Powder Gate, a historic Gothic tower in Prague, is undergoing extensive exterior restorations that began in summer 2024, including cleaning, repairs, and stone railing restoration. HAKI Slovakia, together with EKRO CZ, provided scaffolding and safety solutions, along with technical support and training for Prague City Tourism.
Reconstruction of Kabomhuset in Alingsås
The municipality of Alingsås, Sweden, is in the process of transforming the historic Kabomhuset into a modern municipal office, bringing to light the building's rich heritage and unique challenges. The building needed extensive repairs, including restoration of the roof structure, beams, walls and floors.
Read here about how Eriks Ställningar worked with HAKI to find creative solutions to address the challenges of Kabomhuset.
Harold Wilson Court refurbishment
The HAKI Universal System Scaffolding has been chosen by IBN Scaffold for the refurbishment of Harold Wilson Court in Huddersfield town centre. This 11-storey high-rise residential project, managed by Wates, began in September 2023 and focuses on comprehensive fire safety enhancements to ensure compliance with strict health and safety regulations.
Suspended Stair Tower at DEEP underwater living facility in Wales
In summer 2023 HAKI were presented with the challenge of providing a solution for safe access into the flooded quarry which has a deepest underwater point of 80 meters. This solution needed to have multiple levels above and below the water to provide employees access to the research facility and the 360m2 pontoon for deploying subs.
Renovating Britain's busiest rail station, London Waterloo
The 100-year old station roof will have around 10,000 new glazing panes fitted to replace the existing glass. This replacement will facilitate improved lighting throughout the station and a 50% reduction in the total glass weight to minimise the stress on station infrastructure.
Full height Edge Protection at London's Canary Wharf
Work on refurbishment of one of the tallest tower blocks within Canary Wharf began in July 2023 and is due for completion in 2025. This full refurbishment will ensure that the building, opened in 2001, is modernised whilst setting a new standard in sustainable design.
Securing St John's Church in Bergen
Our Norwegian customer Bergen Stillas has taken on one of its biggest projects to date - the St John's Church, which is crumbling and suffering from fallout. The church is the third tallest building in Bergen, reaching 61 metres above the ground, but its age and height are not the only things that make it unique. It also has a rather peculiar shape. Bergen Stillas' current focus has been to secure the church with customised scaffolding.
Renovation of the Tower Roofs of Lund Cathedral
The renovation of the tower roofs at Lund Cathedral, Sweden, is a unique project where nearly 900 years of cultural heritage meet modern engineering. Through advanced scaffolding solutions, weather protection, and structural calculations, HAKI enabled a safe and efficient renovation – while keeping the cathedral open to visitors. The project’s technical complexity and high quality were rewarded with the Grand Prize at Construction of the Year 2024.
Construction of the Eurovea Skyscraper in Bratislava
The first Slovak skyscraper, Eurovea Tower, has joined Bratislava's iconic skyline, with 45 floors and a height of 168 meters. This project consists of shops as well as 389 high-quality residences with a unique panoramic view of the city along the Danube River.
Construction of the Tøyenbadet swimming pool complex in Oslo
The old Tøyenbadet in Oslo has been demolished and the brand new indoor swimming pool facility is now a work in progress – with HAKI selected as the main shoring and scaffolding supplier together with our customer MB Stillas. Tøyenbadet will be the city's largest swimming facility, and will consist of both indoor and outdoor areas.
Restoration of the Great Church in Stockholm
To restore the Great Church to its original exterior it was crucial to select quality, market-leading scaffolding and temporary access solutions that would enable restoration work to be completed as seamlessly as possible. As an expert in its field, HAKI was more than capable of rising to this special challenge.
Alupercha Fall Protection used on Kidbrooke Village site
The Alupercha, the new lightweight fall arrest system from HAKI has achieved its first milestone, having just completed its first commercial workzone project after its recent market launch.
Bridge System to the Helsingborg ferry terminal
When it came to providing the temporary access solutions for a programme of works on a busy ferry terminal connecting Helsingborg, Sweden and Helsingör, Denmark, HAKI was able to step-up and accept the challenge.
Project Sapphire - Cambridge
HAKI Edge Protection system was installed on the Project Sapphire site in Cambridge to help ensure that work was completed with zero incidents. Fully compliant with EN 13374, Class A, the barrier system provided a highly effective edge protection solution that was able to guarantee the safety of all workers.
Solution for the EnQuest Magnus Platform
EnQuest Magnus (formerly BP Magnus) was one of BP's best-known assets on the UK continental shelf and BP has benefited from a long production run from the oil field. As well as providing hydrocarbon production from the field, Magnus is also the entry point for the Northern Leg gas pipeline, with gas exports from other nearby installations feeding the network for transfer to the onshore St Fergus gas terminal via Brent's.
TechniSpan mobile gantry enables Forth Rail Bridge repairs
A rope access inspection of the South Span of the Forth Rail Bridge highlighted a number of fractures in the steelwork that required to be repaired. Suitable access was required to allow repairs to the steelwork and coating works.
Ninian Central - Crane Boom Replacement
The Ninian Central Platform is a UK North Sea oil platform. Built in Loch Kishorn, Scotland in 1978, the 600,000-tonne structure was the world’s largest movable man-made object at the time, before being towed offshore and installed on the seabed.
Now at the end of its operational life, it is set for multi-year decommissioning. Before work began, one crane boom was replaced to ensure reliability throughout the project.
Hound Point - Mobile Bridge Encapsulation
Hound Point, an Ineos-operated oil export terminal on the Forth Estuary, required recoating of a deteriorated access walkway.
Due to load restrictions preventing traditional scaffolding, a lightweight, fully contained painting gantry was needed to provide safe access while maintaining operations.
Queensferry Crossing Underdeck Platforms
The Queensferry Crossing was probably the largest Scottish civil engineering project of a generation. HAKI Access were involved throughout the construction of the bridge to assist the joint venture with a number of access requirements
HAKI 750 Temporary Roof - Ensus Redcar
Ensus UK, a bioethanol fuel manufacturer producing sustainable livestock feed by-products, required a replacement for an end-of-life industrial grain dryer. To support installation and commissioning, HAKI Access Solutions was contracted to design, supply, and install a temporary system scaffold building to provide weather protection — ensuring construction activities, particularly welding, were protected from wind interference.
Bridge of Cally - Cantilever Drop Scaffold
Bridge of Cally, a village in Perth and Kinross, Scotland, experienced significant bridge damage following heavy rainfall that overwhelmed the drainage system, causing parapet failure and partial undermining of the road deck, resulting in a lane closure. Our client was appointed Principal Contractor, with HAKI Access Solutions subcontracted to deliver specialist scaffolding and rope access services to support the repair works.
Royal Border Bridge - Viaduct Refurbishment
The Royal Border Bridge is a Grade I listed 28-span masonry arch viaduct carrying the East Coast Main Line over the River Tweed. Inspections identified defects including loose brickwork, open joints, parapet deformation, fractured pattress plates, and other masonry deterioration.
HAKI Access Solutions were contracted to design and install a bespoke access solution to enable safe access for the abseiling team to complete the required repairs.
Tay Road Bridge - Underdeck Access
During the 2023/24 restoration of Tay Road Bridge — a key link between Fife and Dundee — VolkerLaser undertook deck refurbishment and underdeck concrete repairs on the structure, which has been exposed to decades of severe weathering since 1966.
HAKI Access Solutions were contracted to provide underdeck access to around 20 repair locations over a two-year programme.
Braefoot Bay West Dolphin - Suspended Access
Braefoot Bay marine terminal required safe access to corroded dolphin walkways for inspection and repair works.
A suspended access deck was installed to enable steel repairs and coating works, including application of a STOPAQ wrapping system to reduce future maintenance and extend service life.
Swimming Pool Inspections & Repairs - Rope Access
HAKI Access Solutions provided IRATA-trained teams to safely complete inspections and defect repairs, supported by approved method statements and site-specific rescue plans.
Crane Boom Access Solution
Offshore crane maintenance is essential but highly disruptive when using traditional scaffolding.
HAKI Access Solutions developed a rapid-deploy crane boom access system for blasting and painting, reducing downtime, labour and equipment while allowing the crane to return to service quickly when required.
Bell's Sports Centre - Rope Access Lighting Replacement
Appointed by the council, JGM Electrical subcontracted HAKI Access Solutions to carry out specialist work at height, replacing 180 high-bay luminaires with LED units. Works were completed using mobile towers and rope access at heights of up to 14 metres.
BP Mungo Underdeck Access
BP Mungo, part of the ETAP infrastructure, required upgraded emergency accommodation and ongoing access support for fireproofing and future system installations.
HAKI Access Solutions designed and installed a suspended underdeck platform to enable commissioning of the accommodation unit, with further reconfigurations planned to support fireproofing works and potential fire-fighting system installation.
BP Mungo Helideck Access
BP Mungo required access to install a retrofitted Remote Fire Fighting System beneath the helideck following new CAA requirements.
HAKI Access Solutions provided a suspended access solution to enable safe, collective access for system installation, delivering a faster alternative to traditional scaffolding.
Fawley Refinery - Tank Relining via Cradles
Esso Fawley, the largest refinery in Europe, required relining of one of its storage tanks to accommodate aviation fuel, including specialist coating and roof upgrades.
HAKI Access Solutions proposed an alternative access solution to traditional scaffolding for spray application works, supporting the use of a remotely operated closed blasting system to improve surface preparation quality while reducing risk and cost.
Fawley Refinery Pipe Bridge
Following earlier successful projects, the refinery sought alternative access solutions to reduce scaffolding footprint and congestion.
HAKI Access provided a quick-install system for MEA line replacement over a pipe bridge, keeping the roadway clear and integrating with existing scaffold, rope access, and minimal traditional scaffolding to improve efficiency and reduce cost.
Crane Boom Access with Lifting Frame
In the UK North Sea, Sparrows Offshore engaged HAKI Access to design and install bespoke access solutions to support replacement of a main winch drum.
The scope required installation of a suspended access platform beneath the boom and erection of a temporary lifting frame using ladder beams, enabling safe installation of a davit crane and associated supporting steelwork.
Harbour Central luxury apartment development in London
HAKI Edge Protection was supplied The Harbour Central project in East London with a complete site safety solution to secure a safe development of 901 luxury apartments. Measuring 9700 m2 and consisting of 4 towers totalling more than 130 floors and a further 3 low rise buildings.
TechiSpan speeds up Forth Road Bridge steelwork changeout
During routine inspections of the Forth Road Bridge in 2015, a crack in the pivot of one of the truss end links was discovered. The changeout of the affected steelwork initially took 18 months to complete; largely slowed down by the traditional scaffolding having to be continually modified to react to the changing work scope.
HAKI BIM saves time and secures future work
Leading scaffold design consultancy, 9Design, has incorporated the HAKI BIM plugin tool to streamline project delivery, save time, and attain better control and visibility of its scaffold projects.
Maintenance work on the Mærsk Inspirer in Denmark
The scaffolding for maintenance work on MÆRSK INSPIER is supplied by HAKI A/S in collaboration with SEMCO MARITIME A/S. The position is approx. 60 meters high, and there are scaffolding on all three legs, about 390 tons of HAKI.
Inspection of the CETAC Fuel Tank at Vitry-Sur-Seine
This circular fuel tank needed to be inspected for corrosion and had pipes that needed to be painted. The customer had limited time to assemble the scaffolding, perform the inspection and to demolish the scaffolding. There were also problems getting around an outside staircase and pipes on the ground.
Roof repair at Château du Haut-Kœnigsbourg in Alsace
HAKI Universal can take you to great heights! Get hooked on its flexibility, light weight and safety. Check out this amazing temporary workplace high up on top of the mountains at the stunning Château du Haut-Kœnigsbourg in Orschwiller, 50 km south of Strasbourg, France.
HAKI maintains the flow on Gade Valley Project
Located between junctions 20 and 21 of London’s M25, the 450m-long Gade Valley Viaduct carries thousands of commuters as they make their way around the capital’s busy motorway.
High-level birdcage scaffold for Waterloo Station
HAKI and CCS Scaffolding were engaged by Wessex Capacity Alliance – a collaboration between Skanska UK, Mott MacDonald, AECOM, Colas Rail – to provide safe, temporary access solutions at Waterloo Station, while around £400m worth of improvements are made.
Future work in scaffold design
Leading scaffold design consultancy, 9Design, has incorporated the HAKI BIM plugin tool to streamline project delivery, save time, and attain better control and visibility of its scaffold projects. The multiple benefits of the HAKI BIM plugin tool were clear to see when 9Design created a complex scaffold design for its client, NJS Australia, a domestic and commercial scaffold specialist.
HAKI provides Weather Protection for HPC Pool Bunker Project
Representing a significant milestone in the UK’s nuclear power industry, Hinkley Point C (HPC) is the first of a new wave of nuclear power sites across the nation which will supply low-carbon electricity for around six million homes. HAKI is working across HPC, supplying temporary buildings and shelters throughout.
HAKI goes large-scale with temporary roof for Xervon project
XERVON required scaffolding to cover 4500m² and a temporary roof to cover 2200m², while new apartments were being built on the roof of an existing building.
Total Dunbar Offshore Project reduced by 85-man days
The Crane Boom on the Total Dunbar offshore platform had deteriorated due to harsh conditions and required changing with minimal disruption. The weather meant that the safety boat could only operate in certain conditions, so the amount of time spent erecting & dismantling the sections of the scaffolds classed as over board was a critical factor.
Højsager Mill Restoration
Højsager Mill was undergoing restoration works and required access around the structure to help repair the body and cover of the building.
Enigma partners with HAKI to deliver Ropeworks Project
Leading main contractor Enigma Industrial Services Ltd has chosen HAKI Scaffolding for their modern, high-profile ‘The Ropeworks’ construction project at Salamander Place in the heart of the vibrant community of Leith, in the city of Edinburgh, Scotland.
HAKI Engineers Temporary Access Solution For Pedestrian Tunnel
Contracted to help build the Køge Nord station near Copenhagen, Denmark, Barberens Stilladser A/S required a challenging access solution that would cover an entire pedestrian tunnel.
450 Tonnes Of HAKI Used In Johan Sverdrup Development
As one of the largest oil discoveries ever made, the Johan Sverdrup field will be one of the most important industrial projects in Norway for the next 50 years.
HAKI collaborates on Hurtigruten Shipbuilding
Norwegian cruise, ferry and cargo operator, Hurtigruten, contracted our customer, Kleven Verft AS, to construct a groundbreaking hybrid-powered expedition cruise ship in early 2018.
Chichester RFC and NJS achieve COVID safe one way route with HAKI Public Access Stairs
NJS purchased a 3-meter-high Public Access Stair (PAS) from HAKI to facilitate an exit route from the stand, as part of the one-way system.
HAKI Stair Towers scale Edinburgh Castle
Lyndon Scaffolding used a 24m high HAKI Stair Tower to allow for the removal of an old and installation of a new flagpole at Edinburgh Castle.
HAKI Public Access Stairs (PAS) erected at Parliament Hill School
Established building and civil engineering contractor Farrans Construction chose HAKI Universal Scaffolding and Public Access Stair (PAS) to provide a temporary access solution at Parliament Hill School in Highgate, London, while new build and renovation works were carried out.
HAKI Bridge System success on Durleigh Reservoir project
HAKI’s stair towers worked in conjunction with the HBS to provide safe, secure site worker access to the bridge.
Rolling Aluminium Scaffold for Hålogaland Bridge Construction
With free span of 1,145 meters, the bridge is the fifth largest suspension bridge in Europe and the second largest in Norway. It opened to traffic in December 2018, following 5 years of construction.
HAKI speeds up programme for Swindon Rail Track upgrade
The temporary bridge had to span 23.5m across the track and provide a safe, comfortable non-slip walkway during the winter months.
Catchfan family used at London's famous Walkie Talkie building
20 Fenchurch Street, London is colloquially known as the Walkie Talkie, borne from its distinctive ‘handset’ appearance benefitted from the use of Catchfans throughout construction.
Barrier System used at Barwa Financial District in Doha, Qatar
Designed and commissioned to serve the local and international Financial Sector. It plays home to 9 towers including a retail shopping centre, a 5-star hotel, financial institutions, residential accommodation and provides parking for up to 5,000 vehicles.
CIBC Square development, downtown Toronto
HAKI has supported the edge protection requirements on this flagship project by supplying 8,000 linear metres of barriers to maintain the safety of project workers and the public in one of the busiest areas of Toronto.
Safeguarding a part of British heritage – Battersea Power Station
HAKI has taken huge pride in supporting the different construction phases of this expansive development with the supply of its V - Compression Post Edge Protection system, Catchfans and Spaghetti Mat.
HAKI Edge Protection selected to safeguard the Central Bank of Ireland
HAKI Edge Protection is delighted to have been chosen to provide essential workzone safety equipment to one of Europe’s most anticipated urban developments; Dublin’s Docklands.
One Tower Bridge - London
Contractor A J Morrisroe appointed by Berkeley Homes engaged the services of HAKI Edge Protection to provide its Catchfan across the 12,500 square metres.
Odeon Tower - Monaco, France
HAKI was the chosen supplier for edge protection providing our barrier system complete with a customised Post edge solution across the buildings 49 floors.
Allianz Riviera - Nice, France
The Allianz Riviera, a purpose built multi-use stadium in Nice, France plays home to the city’s football team OGC Nice and is an impressive addition to France’s stadia.
BP Mungo PFP Offshore Project
We specified the use of HAKI-Span 750 suspended access platform. While used for a number of previous projects, both on and offshore, this installation required a creative deviation from our typical methods of installation. Due to the lack of available pick-ups for both the finished platform, and for the rope access installation team, HAKI Access Solutions used additional wire rope winches to gain access to the area, and to facilitate the installation.
Longannet Boiler Project
One of the more complex requirements was to fit our suspended TechniSpan platform inside one of the stations boilers for various mechanical repairs and tube replacement on the super heaters.
Serica Bruce West Boom Habitat
HAKI Access Solutions have been working in strategic partnership with Sparrows, with a portfolio of existing successful scopes jointly executed. This was driven by the need to bring in a specialist provider to offer true innovation with regards to crane maintenance requirements and move away from traditional methods.