On our website, we use cookies to adapt content and offers to our visitors and to improve our website. By clicking “I consent” below, you confirm that you have read our cookie policy and that you consent to our use of cookies. If you want to know more about our use of cookies and how you disable cookies, you will find it here.
  • Login
HAKI

Public Access Stair (PAS)

In line with the UK’s leading standards, the HAKI Public Access Stair complies with current building regulations to ensure safety of people when gaining access to and moving about in buildings.

With stair widths up to 2.5m and loadings up to 7.5 kN/m², the PAS can handle high volumes of footfall, accommodating up to approximately 36 people per lift at any one time. The steel structure is also robust enough to last long periods of time without replacement of components. This makes it an ideal temporary access solution in public spaces like railway stations, airports, football stadiums, and schools.

Child-safe, adjustable handrails and slip-resistant solid steel decks have been specifically designed for the PAS to protect the public against falls from height when using the temporary staircase.

Like our other stair towers, various configurations are possible with the Public Access Stair – including in-line and spiral – allowing flexibility in design to suit project requirements. The PAS can also be combined with the HAKI Bridge System and Cladding to provide a temporary pedestrian bridge in projects.

Benefits:

  • Loading of up to 7.5kN/m² for high volumes of footfall at any one time
  • Stair widths up to 2.5m for comfortable access
  • Strong steel structure to withstand use for long periods of time
  • Child-safe, adjustable handrails to protect public
  • Slip-resistant solid steel decks instead of mesh grating
  • In-line and spiral configurations available to suit all applications
  • Easily combined with the HAKI Bridge System and Cladding to provide temporary footbridges
  • Advanced Guard Rail for collective measures during erection
  • Simple ‘hook-on’ locking catch system for quick erection
  • Reusable components compatible with other HAKI solutions


Project case study:

“Farrans Construction required a public access solution for the Parliament Hill School in London. We approached HAKI to work with our designers, to offer a concept proposal that met our criteria. HAKI’s technical department were very quick and efficient in their support, and the solution was delivered to site within 24 hours of the working drawing being issued. A HAKI technician was also provided on site to work with our scaffolding contractor, ensuring the system was erected quickly and safely. We certainly wouldn’t hesitate to use HAKI on our projects going forward.”

– Kieran Doyle, Quantity Surveyor, Farrans Construction

Click here to read more about the Parliament Hill School project.

LOOKING FOR PRODUCTIVITY WITH YOUR SCAFFOLDING?

Let HAKI’s global team of experts find you a safe, adaptable access solution.